| Year of birth |  | 1953 |
Current Location/Address |
| City or Town |  | Fintas |
| Country |  | KUWAIT |
Permanent/Home Location/Address |
| Country |  | KUWAIT |
Languages |
| Primary Language |  | Fluency |
| English |  | Read, write and speak fluently |
Nationalities |
| Nationality By Birth |  | USA |
 |  |  |
Experience Classification |
| Job Function |  | Years Experience |
| Captain |  | 6 |
| Project Management |  | 13 |
| QA/QC Manager |  | 5 |
| Welding Engineer |  | 25 |
| Construction Manager |  | 25 |
| Industry |  | Years Experience |
| Nuclear |  | 12 |
| Pipelines |  | 20 |
| Building & Construction |  | 30+ |
| Oil and Gas |  | 15 |
| Petrochemical - Refinery |  | 15 |
Qualifications |
| Highest Qualifications |  | Degree |
| Qualification | Subject | Establishment/Country | Year |
| Degree | Construction Mgmnt. | Northeastern Univ. USA | 1996 |
| Trade Qualifications | Master Pipefitter | | 1975 |
Other Qualifications, Memberships, Certification
American Welding Society
American Concrete Institute
American Society of Mechanical Engineers
Captain U.S. Coast Guard |
Computer Skills and Software Used |
All Microsft Office Suite products
Oracle
Primavera |
Work Locations |
| Are you willing to move or relocate? |  |
Yes - I will travel internationally
Yes - I will relocate internationally |  |
Availability |
| Start Immediately? |  | Available Now |
| Earliest Start Date |  | Given 2 weeks notice |
Ideal Next Job |
I am looking for a role that will challenge my skills and expertise, I am a strong self starter and excel at taking charge and carrying out my essential duties and responsibilities with little or no supervision.
Ideally this would be a Project Management or a Construction Management position in S E Asia. I am particularly interested in Thailand as my first choice but will definitely consider all other Asia-S E Asia locations.
I prefer married status, single can be negotiated as long as I am able to have my wife accompnay me on my own. I have no school aged children, so having to provide schooling is not necessary.
I am open to all offers. |
Required Salary & Conditions |
Salary is negotiable depending on the location offered.
Clean modern housing must be provided, I am not interested in a "camp" status position. A company vehicle or leased/rental vehicle shall be provided. Salary and conditions are all negotiable depending on location with the exception of "camp" status. No camp status will be considered.
The start date indicated below is also negotiable, if offered a position I would like to give 4 weeks notice. |
Employment History |
| Total Years of Work Experience: |  | 39 |
| Commenced Full Time Work: |  | 1970 |
| Name |  | Bechtel |
| Job Title: |  | Project Engineering Manager |
| Duration |  | From : 1993 To: 2006 |
Summary |
I have an extensive backgound of experience and expertise in heavy civil-tunneling-highway, mechanical-petro-chemical and power generating projects. I have managed and supervised mutli-disciplines and diverse international workforces simultaneously.
I can function effectively in a multitude of Project Management or Construction Management positions for both EPC and PMC contracts. I am currently the Project Engineering Manager and Deputy Construction Manager for a 2 Billion dollar Petro-Chemical project in Ahmadi Kuwait consisting of 1.8 Billion dollar PMC Aromatics project and 200 Million EPC contracts for OSBL contracts to tie into the 3 adjacent refineries. It is a complex project involving new PMC and EPC construction and refinery revamp to the 3 existing facilities. I bring with me a ZERO Tolerance People Based Safety approach to begin and end a project with ZERO lost time accidents. I have adminitered projects in excesss of 15 Million manhours with no lost time injuries. |
Work Experience |
NAME:
BRUCE G. AZZARITI (776982) DATE: DECEMBER 2007
WORKING TITLE:
Acting PROJECT ENGINEERING MANAGER-DEPUTY SITE MANAGER
ORGANIZATION:
BECHTEL-EAMS PHOTO
LOCATION:
AHMADI KUWAIT
CITIZENSHIP:
USA
CONTINUOUS SERVICE DATE:
MARCH 8, 1993
SPOUSE'S NAME:
LONI KIEU THI AZZARITI
CHILDREN'S DETAILS:
KEVIN AGE 24
PROFESSIONAL LICENSES AND SOCIETIES:
AMERICAN WELDING SOCIETY #846178
CERTIFIED WELDING INSPECTOR #87060141
N.D.E. RT PT MT VT
A.C.I. CONCRETE INSPECTOR LEVEL I & II
40 HR HAZWOPER CERTIFIED
LICENSED MASTER PIPEFITTER BOSTON, MA.
LICENSED CAPTAIN BY U.S.COAST GUARD FOR 100 TON VESSELS
INTERNAL AND EXTERNAL AUDITS OF VENDORS AND SUBCONTRACTORS ISO 9001-2000
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS:
Degree, Cert., etc. School Major (or Subject) Date
CERTIFICATE NORTHEASTERN UNIVERSITY CONSTRUCTION MANAGEMENT 06/98
OTHER SIGNIFICANT INFORMATION:
FAMILIAR WITH INSPECTION AND INTERPERTATION OF THE FOLLOWING CODES: ASME B.31.3 B.31.1 ASME SECTION 1 ASME SECTION 5 ASME SECTION IX API 1104 620 and 650 AWS D1.1 and D1.5 CHINESE NATIONAL CODE
ASSIGNMENT PREFERENCE: RESIDENT ENGINEER / PROJECT MANAGER / SUPT.
COMPUTER SKILLS: EXCEL, WORD, ORACLE, PRIMAVERA, BSAP, BPS, EXPEDITION, TEAMWORKS, INFOWORKS, DOCUMENTUM
GEOGRAPHIC PREFERENCE: ASIA
WORK HISTORY
08/06
Present BECHTEL LTD.
PIC AROMATICS PROJECT
AHMADI KUWAIT
QA-QC Manager and acting PROJECT ENGINEERING MANAGER for a $ 1.8 Billion PMC Aromatics Project and $ 200 Million EPC in OSBL contracts and the support buildings, the Main Control Building, 3 Electrical Substation buildings and other structures with a peak work force of 8000+ that will tie into 2 existing refineries for the feedstock. My 36+ years of experience and expertise in multi-discipline management and organization afford me the skills to be proficient in several roles at once. I am principally the Project Engineering Manager but also have the duties and responsibilities of the Deputy Construction Manager and Quality Control Manager. My essential duties include managing a diverse construction and engineering work force, coordinate engineering deliverables from Seoul-London-Milan home offices, process all engineering distribution, manage the budget, maintain excellent relationships with senior client personnel, manage the staffing plan and hire all non-manuals for this site, perform annual reviews of direct reports, manage EPC procurement for major components and long lead items, salary planning for all project staff and chair the weekly Progress Review meeting and the Technical Issues meetings. I also bring with me a ZERO Accident philosophy founded in a People Based Safety Process.
11/05 06/06 BECHTEL NATIONAL INC.
HURRICANE KATRINA RELIEF
JACKSON MS
SUPERVISOR BERNIE THOMPSON Lead Quality Assurance Manager for a 500 Million dollar contract with FEMA and the U.S. Army Corps. of Engineers to relocate and house families displaced by huricane Katrina. My duties and responsibilities included managing numerous small subcontractors that had never worked within a structured QA-QC plan. It involved assisting them to write and implement QC plans to comply with state and federal regulations required FEMA and the USACE and performing quarterly audits to ensure compliance. Assist the subcontractors with the invoicing process to meet federal standards set forth by FEMA.
05/05
10/05 BECHTEL LTD.
CNPC CHINA
NANHAI PETRO-CHEMICAL COMPLEX
SUPERVISOR ANDY FALVEY
SR. WELDING ENGINEER I was dispatched to this project as a Subject Matter Expert for a welding problem that surfaced late in construction regarding improperly installed branch connections. After determining the root cause, a plan was developed between the client, Project Management staff, and the contractors to remediate the situation so that commissioning could proceed without interruption. My experience, expertise, and knowledge of applying the applicable codes including the Chinese codes led to a successful outcome instead of costly delays.
12//04
04/05 BNI WTP RICLAND WA
SUPERVISOR FRANK HOPPLE CONTRACT ADMINISTRATOR – SENIOR WWELDING ENGINEER-Responsible for formation and administering all subcontracts for piping and welding subcontractors. Negotiate and resolve any claims issue regarding claims made by the subcontractors. Monitoring all subcontractors welding on the site. My duties include documenting all daily activities performed by each subcontractor for compliance with their approved procedure and with Bechtel procedures. Provide input to sub contract formation for subcontracting of welding onsite and for third party off project inspection services. Teach welder orientation to new welders when they arrive onsite. Buy all welding tools, inspection devices, and consumables for any welding related activities project wide. Initiate FSR / PSR for purchase of materials and services. The short duration on this project was due to the U. S. government taking the budget for the war in Iraq and hurricane Katrina. 2500 laid off from this site.
03/93 12/04 BECHTEL INFRASTRUCTURE CO.
CENTRAL ARTERY/TUNNEL
(CA/T) PROJECT
BOSTON, MASSACHUSETTS
SUPVERVISOR DAVID PETERSILE RESIDENT ENGINEER for several utility and mainline tunnel contracts ranging from 30-380 million dollars. My responsibilities included managing a diverse staff of up to 16 Field Engineers building the 9 Vent Buildings simultaneously, coordinating daily activities across multi disciplines and several contractors. I was also be responsible for tracking, negotiating, and reviewing claims, processing daily quantities, processing bi monthly pay requisitions from 4-12 million dollars a month. This was a very complex project on an accelerated schedule. This work included slurry walls, deep cut and cover tunneling, micro tunneling, pipe jacking, support of excavation, mass excavation, mass concreting, paving, installation and erection of 135 centrifugal fans weighing 52 tons each, and the power distribution, testing, and turn over of all equipment to client.
11/89 03/93 WILLIAM COLLINS CO.
(VARIOUS PROJECTS)
BOSTON, MASSACHUSETTS
SUPV.: ROBERT CONNOLLY.
PROJECT MANAGER. I was Project Manager for various mechanical contracts including M.W.R.A. contract 402/427 at Deer Island Waste-water Treatment Plant. Supervised a multi-discipline work force of up to 60 craft to install 12,000 ‘ of pipe with a value of $1.2 Million dollars. Piping included 20" Moeller district heating system, 16" digester gas, and 12" fuel oil line. All piping was installed to ASME or API related codes. Project Manager at Fore River Staging Area Sludge Facility, contract value $3.2 Million. Duties were to install the piping related to the pelletizing equipment and storage silos including liquid nitrogen fire suppression system, water main and valves. Project Manager for the Payson Park reservoir 42" ductile iron and rebuilt the 4 existing 100-year-old valves downstream of the reservoir project with a contract value of $400 thousand dollars.
KEYWORDS: wastewater treatment, water pipeline, water reservoir, weld stress relieving, weld testing, welder testing, weld procedure writing, welding NDE, values, pipe testing.
05/87 11/89 HAWAIIAN DREDGING
HONOLULU, HAWAII
SUPV.: PETER KRAFT
PIPING SUPERINTENDENT. During this time I was piping Superintendent for the installation of a 30-mile pipeline from the Chevron refinery to deep-water terminal including related mechanical equipment and tankage. The installation of an asphalt plant addition to the Hawaiian Independent Refinery, and the installation of the 2 boilers for the Honolulu trash to energy plant.
06/75 04/87 BECHTEL POWER During this period, I held supervisory positions in welding, piping, quality control and hanger installations at Susquehenna, San Onofre, Diablo Canyon, and Palo Verde nuclear projects through construction, hydro-test, cold function, hot function, and turn over of systems. I have a good working knowledge of procedures and requirements regarding working within the parameters of nuclear construction.
|
Comments/ Hobbies/ Interests etc: |
Travel
Boating
Fishing |
-- End of CV/Resume --
|